Gallery
See below for examples of our work.

Casting raft foundation and supply and erection of steel frame

Project moving onto cladding stage

Drainage works at a housing site for a valued client

Excavation of sub-station base for VHE.

Casting sub-station base for VHE.

One of many Pile Caps on a three story apartment block

Pre-cast piles installed

Piles cropped

Slabs

Cropped piles removed ready for steel reinforcement

Reinforcement tied into piles

Slab cast to a high tolerance

New extension for factory, stainless steel drains fabricated and cast into floor slab

New external walls progressing

Internal process area nearing completion

External area nearing completion

Pre-fabricated man hole. Highly chemical and heat resistant, which we will weld into the pipework system. This man hole will not deteriate like conventional construction exposed to harsh effluents

Y branch being butt welded into new 300mm underground pipework

This system is ideal for coping with acids, alkalis, dairy processes and beverages as all joints are fused welded so there can be no leakage
