Casting raft foundation and supply and erection of steel frame
Project moving onto cladding stage
Drainage works at a housing site for a valued client
Excavation of sub-station base for VHE.
Casting sub-station base for VHE.
One of many Pile Caps on a three story apartment block
Pre-cast piles installed
Piles cropped
Slabs
Cropped piles removed ready for steel reinforcement
Reinforcement tied into piles
Slab cast to a high tolerance
New extension for factory, stainless steel drains fabricated and cast into floor slab
New external walls progressing
Internal process area nearing completion
External area nearing completion
Pre-fabricated man hole. Highly chemical and heat resistant, which we will weld into the pipework system. This man hole will not deteriate like conventional construction exposed to harsh effluents
Y branch being butt welded into new 300mm underground pipework
This system is ideal for coping with acids, alkalis, dairy processes and beverages as all joints are fused welded so there can be no leakage
Man hole and pipe work being fitted into the ground, working as a traditional gravity fed system